General Service Requirements

  • Junction boxes, troughs, or main breakers are not accepted on the source side of multi-metered developments.
  • To provide CPWS needed access a 40-foot easement on primary and a minimum of 10-foot easement for overhead service conductors will be required.
  • When service is placed underground, a minimum of 10-foot easement for primary and secondary is required.
  • Secondary conductors shall be sized to meet or exceed the bus capacity of the service entrance equipment on commercial and industrial installations.
  • CPWS will furnish and install padmounted transformers, primary conductors, and make all connections in transformers.